<b id="x5zpq"></b>
      東莞市邁科儀器設(shè)備有限公司專業(yè)儀器設(shè)備廠家!
      手機網(wǎng)站 | 聯(lián)系我們:15817577758 | 加入收藏
      • 振動耐磨試驗機

        產(chǎn)品型號: 锝- 15(- 1502)(MK-1502)
        品  牌: 韓國(邁科)
        • ≧1 臺
          ¥168000.00
        所 在 地: 廣東東莞
        更新日期: 2024-12-21
        詳細信息
        MEIKO INSTRUMENT TEST MACHINE PARAMETERS
        This manual will guide the users to understand the equipment, how to use in the best conditions, how to increase productivity, how to maintain the equipment in the very simple way.   
         WARRANTY
        1.Warraty period of this equipment is 1 year or 2000 hours whichever comes first. and warranty period of the electrical parts is 6 months.
        This is based on the normal operation, operators mistake or mishandling of the equipment, excessive operation beyond its capability and failure to maintain on time will release the warranty obligation.
        2. In any case that the user has changed the machine parts or corrected without any prior agreement, this warranty will be invalid..
        PAINTING DURABILITY TESTER MACHINE
        MODEL : TC - 15 (SM - 1502)
        I. COMPOSITION OF THE EQUIPMENT
        1. VIBRATORY TUMBLER
        2. SOUND COVER
        3. AUTO WATER & COMPOUND SUPPLY SYSTEM
        4. CONTROL UNIT
        II. SPECIFICATION OF THE EQUIPMENT
        1. VIBRATORY TUMBLER
        Tub interior dimension: W180mm x L530mm
        In-put area dimension: W130mm x L530mm
        LINING : Hot pour Polyurethane Casting, Thickness: 15mm
        Motor : 220V x 1Hp x 3ph x 60Hz. (2 pole)
        Motor R.P.M : 3500
        2. SOUND COVER
        L920mm x W620mm x H900mm+120mm
        Top door with Gas Cylinder
        3. AUTO WATER & COMPOUND SUPPLY SYSTEM
        Water tank, metered to be 500ml
        Water tank, metered to be 1000ml + addition of Compound 200ml
        Water tank, metered to be 500ml + addition of Compound 20ml
        Compound metering pump 300ml/min, adjusted to supply 200 ml by a timer.
        Compound metering pump 20ml/min, adjusted to supply 20 ml by a timer.
        III. UTILITY REQUIREMENT
        1 Electrical Power: 220V x 1Ph (20A).
        2 Tap water: 4L/Hr. (To be linked to the right side of the control unit by 8mm hose.)
        IV. INSTALLATION
        Just place on the flat concrete floor without any anchoring.
        In case the equipment is not horizontally leveled, the mass in the tumbler can move to a side,
        please be careful.
        Please link 3 wires from the motor to the U.V.W. terminal in the control box.
        Please link 2 wires from the main source of electrical power to the R.T. terminal in the box.
        Please link tap water to the supply valve on the right side of the control box by 8mm hose.
        In case Tap water contains some foreign substance, please install pre-filter before this hose.
        Please link a hose(20mm) from the hose nipple on left side of the control box to the main machine.
        A little longer hose is shipped with machine, please cut it off and adjust depending on
        the site allocation
        . Please link the discharge valve on the rear side of machine to the laboratory discharge pipe line.
        Please leave the discharge valve always open except for the maintenance.
        A compound container needs to be placed in the room under the control box.
        Please remove the top lid and place the container in the room and put a separate lid pre-drilled
        on 3 places, 1 big hole in the center and 2 small holes on the right and left.
        On the center hole, please place a level sensor which emit alarm when there is not enough
        compound in the container,
        and on the right and left holes insert 2 hoses that come from the metering pumps.
        V. OPERATION
        Supply the control box with power (put the Breaker switch ON, put the disconnect switch ON) and
        put the selector switch ON, then you will have light on the Power lamp.
        Fill the vibratory tumbler with media 15L (11.25L of Cone and 3.75L of Pyramid).
        Put the Mode to Manu and push on Start.
        If the mass turns from front to back, the motor direction is correct.
        In case it turns in the opposite direction please correct by changing the wire.
        1. PREPARATION COURSE
        The media contains some flashes and burrs. This course is, prior to the main course of testing,
        to condition the media by tumbling to the right purpose of the testing.
        First of all, put MODE to Manu and push on PRE WATER-1, then 500ml tank will be filled with water.
        Pls push on only once, if you push on twice it will be stopped.
        O Once it is full, it will be automatically disconnected. When the water is evacuated, the tank
        is automatically refilled, therefore from next time, there is no need to put to Manu and fill again..
        Set the timer 4 hours or 10 hours as required by your company (currently designated to be 10 hours).
        Put Mode to PRE and push on Start then the tumbler will start to run and 2000 ml of water
        will be supplied automatically.(4 times of 500ml)
        At the time of start, 2000ml will be supplied and 500ml will be supplied every 30 min. automatically.
        The tank always keeps water 500ml. and supplies when it is required.
        2. MAIN COURSE OF TESTING
        This course is to test whether the testing parts are safe or damaged when the media and parts
        have rubbed each other in the vibratory tumbler.
        First of all, put MODE to Manu and push on MAIN Water-1, then water will be ready with 1000ml
        in the tank 1, push on MAIN Water-2 then water will be ready with 500ml in the tank 2.
        Push on Comp-1, then 200ml of compound will be added to 1000ml of water in the tank-1.
        Push on Comp-2, then 20ml of compound will be added to 500ml of water in the tank-2.
        Pls push on only once, if you push on twice it will be stopped.
        Once you have filled for the first time, when the liquid is evacuated, it is made again automatically
        therefore there is no need to do manually again.
        Set the timer 1 hour or 2 hours as required by your company.
        Put the MODE to Manu and start the machine, then 1000mml of water and 200ml of compound
        will be automatically supplied in the beginning and 500ml of water and 20ml of compound
        will be supplied every 30 min.
        (Note) When there is not enough compound, you will have Alarm light on the control panel,
        please fill the container with compound.
         VI. MAINTENANCE
        In case the inverter inside the control box repeats to trip, one of the 3 wires from the motor
        might have been disconnected by the vibration. Please take out the vibratory tumbler from the
        sound proof box and disassemble the drain pipe lines and lift up the tub and check the wires
        from the motor. If any of the wires were disconnected, please correct it.
        In case there is any loud noise from the vibratory tumbler, the bearings on the motor must have
        broken, please replace them referring to the assembly drawing of the motor.
        In case the liquid of water and compound is not supplied well, some foreign substance might have
        been stuck in the ball, please clean the valve referring to the separate manual.
        In case compound is not well injected from the metering pump, please clean the balls on the
        suction and discharge port of the diaphragm pump.
        (Referring to the separate manual, pls clean part No. 2,3,4.)
        This may happen after long holidays.
        Please clean the filter that is installed right after the in-put water valve on the right side of
        the control box.
        VII. WARRANTY & FREE REPLACEMENT
        We warrant quality for either 380 days from the date of shipment or 2000 hours of operation,
        whichever comes first. In case any part does not work properly, we send replacement part only.
        PRODUCTPICTURE:

        聯(lián)系人:陳春華   
                陳春林  

        翻譯中文參數(shù):

        邁科儀器試驗機參數(shù)
        本手冊將引導(dǎo)用戶了解如何使用設(shè)備,在*好的情況下,如何提高生產(chǎn)力,如何保持設(shè)備非常簡單的方式。
        保修
        1。本設(shè)備保修期是1年或2000小時,以先到者為準(zhǔn)。與質(zhì)保期為6個月的電器配件。
        這是正常運行的基礎(chǔ)上,操作者的錯誤或不當(dāng)?shù)脑O(shè)備,過度操作超出其能力和未能保持的時間將釋放保修義務(wù)。
        2。在任何情況下,改變了用戶的機器零件或糾正沒有任何先前的協(xié)議,這保證將是無效的了。
        繪畫耐久測試機
        模型:锝- 15- 1502
        我組成的設(shè)備
        1。振動滾筒
        2。聲音蓋
        3。汽車復(fù)合系統(tǒng)
        4?刂茊卧
        。規(guī)范的設(shè)備
        1。振動滾筒
        浴缸內(nèi)部尺寸:w180mm×l530mm
        輸入?yún)^(qū)尺寸:w130mm×l530mm
        李寧:熱澆聚氨酯澆注,厚度:15毫米
        電機:220××60×3 PH 1馬力。(2桿)
        電機轉(zhuǎn)速:3500
        2。聲音蓋
        l920mm×w620mm h900mm + 120 mm×
        門頂與氣瓶
        3。汽車復(fù)合系統(tǒng)
        水箱,計量為500毫升
        水箱,計量為1000 ml +添加復(fù)合霜
        水箱,計量為500 ml +添加復(fù)合20毫升
        化合物的計量泵300毫升/分鐘,調(diào)整供應(yīng)200毫升的計時器。
        化合物的計量泵20毫升/分鐘,調(diào)整供應(yīng)20毫升的計時器。
        三、實用要求
        1電源:220×1ph20)。
        2自來水:升/小時。(是與右側(cè)的控制單元由8毫米軟管。)
        四。安裝
        剛才的地方,在平坦的水泥地面沒有任何錨。
        如果設(shè)備不是橫向夷為平地,大眾在不倒翁可以移到一邊,
        請小心。
        請聯(lián)系3線從電機到u.v.w.終端在控制箱。
        請聯(lián)系2線從主要的電力來源為終端盒。
        請聯(lián)系自來水供應(yīng)閥門在右側(cè)的控制盒8毫米軟管。
        如果自來水含有一些雜質(zhì),請安裝過濾器前軟管。
        請連結(jié)軟管(20毫米)從軟管接頭左一側(cè)的控制箱的機器。
        長一點的軟管裝機,請把它關(guān)閉和調(diào)整取決于
        該網(wǎng)站配置
        。請聯(lián)系該排放閥的后端機實驗室排氣管路。
        請把排放閥常開除了維護。
        復(fù)合容器需要放置在房間的控制箱。
        請將上蓋和容器中的房間,一個單獨的蓋子鉆孔
        3個地方,1大中心孔和2個小洞的左右。
        在中心孔,請將液位傳感器發(fā)出報警時沒有足夠的
        復(fù)合容器,
        和左右2孔插入軟管從計量泵。
        五操作
        供應(yīng)控制箱與電源(把斷路器開關(guān),把斷開開關(guān))和
        把選擇開關(guān),你的光就必在電源燈。
        填補振動與媒體1511.25l錐和3.75l角錐)。
        提出的模式和推進開始菜單。
        如果原來從前線回來,運動的方向是正確的。
        如果它在相反的方向轉(zhuǎn)請糾正通過改變線。
        1。預(yù)備課程
        媒體包含一些閃爍和毛刺。這當(dāng)然是,之前的主要過程測試,
        條件的媒體翻滾到正確目的測試。
        首先,把模式吉諾比利和推前water-1 500毫升,然后將坦克裝滿了水。
        請推上只有一次,如果你推兩次將停止。
        哦,一旦它是全面的,它會自動斷開。當(dāng)水被疏散,坦克
        自動裝填,因此從明年的時候,就不需要把馬努和填補了。
        設(shè)置定時器4小時或10小時為您所需要的公司(目前指定為10小時)。
        把模式前和推不倒翁開始然后將開始運行,2000毫升的水
        將自動提供(4 ml)。
        在開始時的綠色,將供應(yīng)500毫升將提供每30分鐘自動。
        坦克一直保持水和用品時,它是必需的。
        2。主要課程測試
        這當(dāng)然是要測試是否測試是安全或損壞時,媒體和配件
        把對方的振動滾筒。
        首先,把馬努和推模式主要water-1,水會準(zhǔn)備一毫升
        在坦克1,推上主要water-2水會準(zhǔn)備在罐2毫升。
        推進comp-1,然后200毫升的化合物將被添加到水在tank-1 1000毫升。
        推進comp-2,然后水化合物將被添加到500毫升水在tank-2。
        請推上只有一次,如果你推兩次將停止。
        一旦你有了*次填充,當(dāng)液體疏散,它是由自動再次
        因此不需要再做手工。
        設(shè)置定時器1小時或2小時為您所需要的公司。
        把模式菜單并啟動機器,然后1000mml水和油化合物
        將自動提供在開始和500毫升水和水化合物
        將提供每30分鐘。
        (注)當(dāng)沒有足夠的復(fù)合,你會有報*的控制面板,
        請?zhí)顚懭萜鲝?fù)合。
        六、維修
        在逆變器控制盒內(nèi)的重復(fù),3線之一的電機
        可能已斷開的振動。請把杯子從振動
        隔音箱和拆卸排水管路,解除了浴缸和檢查電線
        從電機。如果任何電線斷開,請改正它。
        若有任何噪聲振動滾筒軸承,電機必須具有
        損壞,請更換指的是裝配的電動機。
        在案件的液態(tài)水和復(fù)合不提供,一些外國物質(zhì)可能有
        被困在球,請清潔閥指的是單獨的手冊。
        在案件復(fù)合不注入從計量泵,請清潔球上
        吸入和排出端口的隔膜泵。
        (指單獨的手冊,第2部分請清潔。)
        這可能發(fā)生在長時間的假期。
        請清潔過濾器,安裝后,輸入水閥的另一邊控制箱。
        第七。保修和免費更換
        我們保證質(zhì)量或者裝運日后380天或2000小時的作業(yè),
        無論哪個先來。在案件的任何部分不能正常工作,我們將更換零件只。
        產(chǎn)品圖片:
             

      • 留言
        標(biāo)  題: *(必填)
        內(nèi)  容: *(必填)
        聯(lián)系人:
        郵  箱:
        手  機:
        固  話:
        *(必填)
        公  司: *(必填)
        地  址: *(必填)
      版權(quán)所有 © 東莞市邁科儀器設(shè)備有限公司
      主營產(chǎn)品:微電腦插拔力試驗機,微電腦拉力試驗機,落球沖擊試驗機,耐磨擦試驗機,線材伸長率試驗機,按鍵壽命試驗機
      聯(lián)系人:陳先生  聯(lián)系電話:0769-82164802  傳真:0769-82164802
      聯(lián)系地址:東莞市塘廈鎮(zhèn)蓮湖工業(yè)區(qū)塘蓮街31號(邁科工業(yè)園)

      技術(shù)支持:谷瀑     免責(zé)申明     粵ICP備12028015號
      日本丰满少妇高清中文字幕,无码av无码天堂资无码,水蜜桃无码视频人在线观看,久久人搡人人玩人妻精AV

        <b id="x5zpq"></b>